8 billion spent on the north-south road, black paper target up to Korla
Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.
Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.
Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.
For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.
Express
Related News
Re-operation after five months at Satighat of Arun river
Bhojpur. The Arun river ferry service at Satighat, which connects Bhojpur and Sankhuwasabha from the north, has resumed operation after six months. The ferry, which has been closed since last May due to rain, has been brought back into operation f...
The price of gold and silver fell sharply, how much per tola on Sunday?
Kathmandu. The price of gold in the Nepali market today has fallen drastically. Gold fell by Rs 4,500 per tola in one day. According to the Nepal Gold and Silver Traders Federation, gold is being bought and sold at 294,000 rupees per tola today.
430 million new notes of 1000 will be printed in China
Kathmandu. The central bank has also awarded a contract to a Chinese company to print new 1,000-rate notes. According to Rashtra Bank, China Bank Note Printing and Minting Corporation has been awarded the contract to p...
During the quarter of the current year, 25 local levels are still without budget
Kathmandu. Although four months of the current financial year have been completed, 24 local levels of Madhesh Province have not been able to present their budgets. So far, a total of 728 local levels have presented bud...
Madhesh Pradesh CEO Club members honored by National Life
Kathmandu. National Life Insurance Company Ltd. has completed the CEO Club member honoring program at Mithila Yatri in Janakpur under the chairmanship of the company's chief executive officer. In financial year 2081-82, 77 agents who qualified fro...
The stock market increased by 64 points, turnover of 21 billion
Kathmandu. The NEPSE index increased by 64.67 points on the fifth trading day of the week. After the election, the stock market, which started rising gradually, closed at 2877.02 points on Thursday with an increase of 2.29 percent.
When 5 cr...



