8 billion spent on the north-south road, black paper target up to Korla
Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.
Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.
Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.
For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.
Express
Related News
NEPSE decreased by 13 points, turnover exceeded 5 billion!
Kathmandu. On the fourth trading day of the week, the NEPSE index fell by 13.35 points to 2635.94 points. Today, when 1.6 million shares of 323 companies were bought and sold, the total turnover reached 5.17 billion rupees.
In trading, the s...
What is the exchange rate of which foreign currency on Sunday?
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for Sunday. According to the fixed exchange rate, the buying rate of one US dollar is 148 rupees 39 paisa and the selling rate is 148 rupees 99 paisa. Similarly, the...
Siddharth Bank called the annual general meeting to pass the dividend proposal
Kathmandu. Siddharth Bank has announced to distribute dividends to the shareholders from the profits of the last financial year. The bank has announced that it will distribute bonus shares at the rate of 5% of the paid...
The new interest rate of commercial banks for the month of Baisakh has been announced, who's how much?
Kathmandu. The new interest rates announced by the commercial banks for the month of April have indicated a slight decline in deposits. Compared to Chait, the average interest rate of both personal and institutional deposits has decreased in Baisa...
The price of one tola of gold is three lakh eighteen thousand eight hundred
Kathmandu. Even today, the price of gold and silver has set a record in the local market. According to the Federation of Nepal Gold and Silver Traders, today the price of one tola of printed gold is 318 thousand 800 and the value of silver is 7 th...
The price of gold continues to rise
Kathmandu. Due to fluctuations in the international market, gradual increase in prices and changes in demand, the price of gold in the domestic market has been continuously rising. According to the Nepal Gold and Silve...



