8 billion spent on the north-south road, black paper target up to Korla
Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.
Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.
Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.
For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.
Express
Related News
A decline of 4.98 points in NEPSE, the turnover decreased by 3 billion 77 crores
Kathmandu. On the fourth trading day of the week, the NEPSE index decreased by 4.98 points to 2561.08. During the day, 83 lakh 88 thousand 373 shares of 338 companies were bought and sold. Today, while the share price...
Yambaling Hydropower will issue an IPO to the general public from May 16
Kathmandu. Yambaling Hydropower Company Limited is going to issue an IPO to the general public from the 16th of Baisakh. In the first phase, after distributing the IPO to project-affected and foreign employed Nepalis, the second phase is to issue...
IPO of Super Khudi Hydro worth 1 lakh 28 thousand is open from February 5
Kathmandu. Super Khudi Hydropower Limited is going to issue an IPO for the general public from Monday 5th February to Sunday 10th February. Earlier, it was said that the issue would be opened from February 4th, but the said date has been shifted o...
From today, cylinder gas in the market: Price fixed at 2 thousand 60 rupees per cylinder
Kathmandu. Addressing the discomfort of cooking gas LP gas seen in the market and the demand of consumers, Nepal Oil Corporation is going to start the sale and distribution of full weight cylinders of gas across the country from Wednesday. The cor...
Heavy fall in the price of gold and silver, how much is the transaction going on today?
Kathmandu. The price of gold has decreased in the Nepalese market. Today the price of gold has decreased by 9 thousand 500 rupees per tola. According to the Nepal Gold and Silver Traders Federation, 2 lakh 95 thousand 200 rupees have been fixed in...
Here is the foreign currency exchange rate for today
Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 152 rupees 67 paisa and the selling rate is 152 rupees 27 paisa.
The b...



