August 28, 2026, Friday
English

8 billion spent on the north-south road, black paper target up to Korla

Main News Image

Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.

Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.

Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.

For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.

mediabaaji add

Related News

6 Public notice to terminate contract with builder

Kathmandu. The road division office under the Ministry of Physical Infrastructure and Transport, Roads Department, Sanfebagar, Achham, has warned of breaking the contract agreement with 6 builders who do not complete the work undertaken on time.

Private sector urges accelerated economic growth through wealth creation and legal reform

Kathmandu: Birendra Raj Pandey, President of the Confederation of Nepalese Industries (CNI), said that the private sector is encouraged by the current stability seen in the country’s economic system. He stressed that since such stability is a rare...

Gold price increased, how much per tola?

Kathmandu. The price of gold and silver has increased in the local market on Sunday. Compared to last Friday, gold has increased by Rs 1,900 and silver by Rs 40. According to the Nepal Gold and Silver Trade Federation, today the price of one tola...

The price of gold decreased by 3600 per tola!

Kathmandu. The price of gold and silver has decreased in the local market. On Wednesday, June 9, the price of 100 gold fell by 3600 rupees per tola, according to the Nepal Gold and Silver Traders Federation. According to the federation, on this da...

Trunkline dues dispute: Industrialists agree to deposit deposit

Kathmandu. Industries have come to an agreement on dedicated and trunk line dues disputes. According to the Confederation of Nepal Industry and Commerce, it has been agreed to go for a review by depositing an amount eq...

A decline of 27.64 points in NEPSE, limited to 5.15 billion

Kathmandu. On the third trading day of the week, the stock market NEPSE index fell by 27.64 points to 2595.24. In NEPSE, 134 lakh 3 thousand 898 shares of 322 companies were bought and sold on this day, and over 5.15 b...