August 28, 2026, Friday
English

8 billion spent on the north-south road, black paper target up to Korla

Main News Image

Kathmandu. As part of the north-south trade route expansion project, Rs. The project has spent 82 percent of the budget while the proposed cost estimate of the project is Rs 10.57 billion till FY 2081-82.

Under the Korla road of national pride connecting India and China, a 202 km road track has been opened from Maludhunga in the mountain to Nepal-China Korlana. According to the decision of the Council of Ministers on November 12, 2073, Kaligand Corridor 9Beni-Jomsam-Korla road was established as a separate project. Under which the project has been continuously upgrading the roads in Parbat, Myagdi and Mustang sections since 2073 and 74. The last revised completion period of the project has been proposed for the year 2082 and 2083. But since the road up to Korlanaka needs to be paved, it is certain that the completed period will be revised again.

Under this Kaligandaki Corridor road project, the target is to open 202 km of road tracks, 97 km of road gravel, 150 km of tarmac and 19 bridges. According to the target, by the year 2081 and 2082, the project has opened 202 kilometers of road tracks, 94 kilometers of road gravel, 88 kilometers of black paper and construction of 14 bridges have been completed, project chief Tejashwi Sharma has informed.

For Korla road, through the project, 3 km of gravel and 10 km of Kagbeni-Chusang will have to be blacked on 27 km of the road and a new contract will have to be issued for the rest. Under this project, if the 9 Kagbeni-Korla road section is also covered with black, the total cost estimate of the project may be more than 15 billion, according to the head of the project Sharma. According to the head of the project, the goal is to upgrade the road and blacken the entire 202 km double lane of the Korla road section and build the necessary bridge.

mediabaaji add

Related News

What is the exchange rate of foreign currency on Wednesday?

Kathmandu. Nepal Rastra Bank has determined the exchange rate of foreign currency for today. According to Rashtra Bank, the buying rate of one US dollar has been fixed at 141 rupees 48 paisa and the selling rate is 142...

Electricity and water lines were cut in 63 industries on the same day

  1. Kathmandu. Industrial Area Management Limited cut the water and electricity lines of 63 industries in one day. After not paying the rent and fees even using the government land, buildings and infrastructure of the industrial area for a long t...

On Wednesday, the NEPSE fell by 30.09 points, with debentures the most traded

Kathmandu. On Wednesday, the third day of trading of the week, the stock market gauge NEPSE index decreased. On Wednesday, NEPSE index decreased by 30.09 points to 2621.59 points. A total of 84 lakh 63 thousand 15 shares of 362 companies were boug...

When the price of gold fell, silver rose!

Kathmandu. The price of gold has decreased in the Nepali market on Wednesday, June 13. The price of gold has decreased by one thousand rupees per tola, according to the Nepal Gold and Silver Traders Federation. On this day, the price of gold in Ch...

How was the weather across the country on Friday?

Kathmandu. Currently, there is no significant impact of any weather system across the country, according to the Water and Weather Forecast Division.
According to the division, the weather will remain mostly clear...

NMB Bank launches Pre-Owned EV loan for personal and commercial purposes

Kathmandu. NMB Bank Limited has launched a second-hand EV loan facility with the aim of facilitating the purchase of old (second-hand) electric vehicles for individuals and various organizations. This initiative of the bank, which is prioritizing...