September 2, 2026, Wednesday
English

38 people are believed to be trapped in the Upper Trishuli 3 'A' Tunnel: The mouth of the tunnel was opened by blasting

Main News Image

The Kathmandu. As many as 38 technicians and workers are believed to be trapped inside the tunnel tunnel of the 60-megawatt Upper Trishuli 3A hydropower project due to the severe floods in the Bhotekosi and Trishuli rivers on Wednesday.

Continuous efforts are being made throughout the night to rescue the trapped. The mouth of the tunnel was opened by blasting at 3 am on Monday while cleaning the 'only portal' of the tunnel. After the opening of the tunnel, a large amount of water was found to be trapped inside, so the 9 dewatering work to drain out the drainage water using 'water pumpsets' has been accelerated.

To further speed up the rescue operation and make the dewatering process effective, additional high-capacity DG sets, 9 diesel generators and pump sets have already been delivered to the construction site. At the same time, work is also being done to prepare a safe way to enter the tunnel by removing large stones and mud piles accumulated at the mouth of the tunnel.

mediabaaji add

Related News

Construction of 88 km long ring road in Bharatpur, mayor-deputy mayor inaugurated

Kathmandu. National Highway NH-77, the country's longest metropolitan wide circular path connecting various wards of Bharatpur Metropolitan City, was inaugurated today amid a program. Metropolitan Chief Renu Dahal and Deputy Chief Chitrasen Adhika...

The helicopter carrying the dead body from Kathmandu crashed

Kathmandu. A helicopter has crashed in Kepilasgarhi Rural Municipality 2 of Khotang. Chief District Officer Rekha Kandel informed that the Air Daneshti Nine N (AFQ) helicopter carrying dead bodies brought from Britain to Khotang met with an accide...

Eight deaths in one month due to fire

Kathmandu. The National Disaster Risk Reduction and Management Authority has requested all three levels of government to coordinate and facilitate the necessary preparations, response and recovery activities to prevent...

Preparing to finalize the agreement between the government and the protestors

Kathmandu. Prime Minister Sushila Karki discussed with the leading representatives of Gen-G movement today. The issue of finalizing the draft agreement between the government and the protestors was discussed. Genji rep...

After the final safety test, Nagadhunga-Sisnekhola tunnel will be opened for public by July

Kathmandu. The Nagadhunga-Sisnekhola tunnel, which has been officially inaugurated, will be put into operation for the general public and public transport within the month of July. According to the road department, the tunnel is currently in opera...

Initiatives to resolve premium fee disputes related to dedicated and trucklines are positive

Kathmandu. Industrialists have welcomed the government's initiative to resolve the long-standing dedicated and truckline premium charge dispute between the Nepal Electricity Authority and large industries. A team of in...